Active Alerts

If you are experiencing a water, power, or sewer emergency or service problem call our 24-hour hotline at 3-1-1 or (415) 701-2311 from outside SF or log on at sf311.org. Learn more or review active service alerts.
What is a Project Labor Agreement? Our capital improvement programs are possible through project labor agreements (PLAs). These are formal agreements with local labor unions which ensure that local workers and residents impacted by these capital projects have access to construction training and job opportunities. Over the years, PLAs have brought thousands of critically needed jobs to San Francisco, while building healthier, more reliable water and sewer systems.
The Stormwater Management Requirements and Design Guidelines (SMR) outlines the mandatory requirements for managing post-construction stormwater runoff and provides guidance on how to incorporate green infrastructure into site design. The performance requirements vary depending on the type of sewer system servicing a project (combined or separate), the agency with jurisdiction over the project (SFPUC or Port), and the size of the project. Refer to the SMR Summary Flyer for more information. The Stormwater Management Ordinance (SMO) – Public Works Code, Article 4.2 Sections 147-147.6 – requires