Active Alerts

If you are experiencing a water, power, or sewer emergency or service problem call our 24-hour hotline at 3-1-1 or (415) 701-2311 from outside SF or log on at sf311.org. Learn more or review active service alerts.

Valve Installation for O'Shaughnessy Dam Drum Gate Automation

Overview

The San Francisco Public Utilities Commission (SFPUC) owns and operates the Hetch Hetchy Regional Water System that delivers drinking water to 2.7 million people in Alameda, Santa Clara, San Mateo, Tuolumne and San Francisco counties.

In 2008, the SFPUC adopted the Water System Improvement Program (WSIP), to repair, replace, and seismically upgrade the Hetch Hetchy Regional Water System. The Alameda Creek Recapture Project (ACRP) is one component of the WSIP. The Calaveras Dam Replacement Project (CDRP), another WSIP project, is designed to restore the historic storage capacity of Calaveras Reservoir. CDRP is currently in construction was completed in June 2019.

  • Construction Start: TBD
  • Cost: $34 Million
  • Project Phase: Planning